Laserfiche WebLink
r� <br />a field production requirement of at least 90% of the reference area. Irrigated <br />Cropland must meet production requirements based on a reference area or a <br />standard, but for a longer period of time, Details on the differences in topsoil <br />replacement and other specifics of the reclamation plan can be found in Section <br />2.05.4(2)(c)- Backfilling and Grading, 2.05.4(2)(d) - Topsoil Redistribution and <br />2.05.4(2)(e) Revegetation. <br />The changes being trade to the reclamation plan for the New Horizon #2 Mule are based <br />on sound engineering and science. These changes are necessary to meet State <br />enviromnental requirements. and to ensure that Western Fuels can reclaim properly and <br />return the land to the landowners in the most sustainable condition possible. <br />If you have any questions or concerns, please feel free to contact myself or Greg <br />• Lewicki. My number is 970 -864 -7910. Greg Lewicki can be reached at 303 -346 -5196. <br />Sincerely, <br />Ross Gubka , <br />f--' <br />Western Fuels - Colorado <br />PO Box 628 <br />Nucla, CO 81424 <br />EltirDATA NTILLOYD FAMILY%IIoyd response 21apri116.N%pd <br />1 / <br />u <br />