My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-14_PERMIT FILE - M2020025 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020025
>
2020-07-14_PERMIT FILE - M2020025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 5:29:39 AM
Creation date
7/16/2020 8:47:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020025
IBM Index Class Name
Permit File
Doc Date
7/14/2020
Doc Name
Application
From
Gregg Morrill
To
DRMS
Email Name
DMC
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D RECLAMATION PLAN <br /> 1. General Reclamation Plan <br /> The maximum disturbed area to be reclaimed under this permit is 2.5 acres out of the 9.4-acre <br /> permit area. Reclamation plans can be viewed on Map E-3. Post-mining land use will return the <br /> entire disturbed site back to dry rangeland with native grasses on all slopes and is consistent with <br /> existing land use in the area. Areas designated as gravel storage areas by the landowner will <br /> remain as such and will not be reclaimed. All slopes will be reclaimed to 3H:1 V or shallower. <br /> As described in the mining plan, reclamation will occur concurrently with mining. <br /> 2. Topsoil and Overburden Replacement <br /> Overburden throughout the site is variably thick and recovered overburden from each new <br /> mining area will be used to backfill, as needed, the previous mining area. Topsoil on site is <br /> anticipated to range from 0-4 inches thick. During mining, all excess topsoil and overburden will <br /> be stored in stockpiles in the northwest extent of the site as shown on Map E-2. Topsoil will be <br /> replaced over each mined area after the next mining area is stripped of its topsoil and <br /> overburden. Topsoil thickness upon replacement is expected to be 2 inches thick,the pre-mine <br /> average depth for the site. <br /> 3. Haul Roads and Access <br /> One access road will connect the site to State Highway 141. County R 13 Road will be used to <br /> access the water pump. Onsite haul roads will be flexible as mining moves throughout the site. <br /> See the enclosed affidavit, following Exhibit C, signed by the landowner ensuring onsite mining <br /> roads will remain on the site after mining. See Map E-3 for the layout of roads after mining and <br /> reclamation. <br /> 4. Reclamation Timetable <br /> Reclamation earthworks will occur as mining progresses throughout the site. Reclamation <br /> seeding will occur after each previously mined phase is retopsoiled. <br /> Bancroft Placer Mine GrV 1.vndu a"Auensta4 YIAA <br /> July 2020 D-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.