My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-14_PERMIT FILE - M2020025 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020025
>
2020-07-14_PERMIT FILE - M2020025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 5:29:39 AM
Creation date
7/16/2020 8:47:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020025
IBM Index Class Name
Permit File
Doc Date
7/14/2020
Doc Name
Application
From
Gregg Morrill
To
DRMS
Email Name
DMC
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
appropriated. Water will be pumped from the area southwest of the R 13 Road within the County <br /> Right-of-Way on the east side of the Dolores River. A hose will run along the ground surface, <br /> through a 48"culvert under State Highway 141, and onto the site. The pump hose will enter the <br /> site at the site entrance. A totalizing flow meter will be used to track all water pulled from the <br /> river and to be reportable to the Water Commissioner. It is estimated that the operation will <br /> consume < 0.5 acre-feet of water per day for dust suppression and for use in the processing plant. <br /> Gold processing equipment is portable; however, the processing area will remain in the northeast <br /> corner of the site. An APEN will not be required as the site will not mine>70,000 tons of <br /> material per year and is therefore exempt. Portable mining equipment such as loaders, trucks and <br /> excavators will be serviced on an as-needed basis onsite. Upon reclamation,all portable <br /> equipment will be removed from the site. A summary of equipment and related tanks that may <br /> exist on site at any given time is listed below. <br /> - Overflow resource stockpiling <br /> - Tailings pond serving as a stormwater settling pond <br /> - 500-gallon diesel fuel tank in secondary containment(110%of tank capacity) <br /> - Off camper(includes hygiene facilities) <br /> The following list is the best estimate of equipment that will be used onsite throughout the mine <br /> life: <br /> - 1 Front end loaders <br /> - 1 Backhoe <br /> - I Dump truck <br /> - Portable gold-bearing gravel wash plant and gold processing equipment <br /> All fuel tanks will have secondary containment. The current 500-gallon tank is within a steel <br /> cattle tank. Fuel tanks will be located in the processing area; see Map E-2. Several hazardous <br /> materials may be stored and used onsite throughout the project. These materials include products <br /> that are associated with diesel motors. <br /> Bancroft Placer Mine t•egR Ir. -40&od Afaociaw.PI AA <br /> July 2020 C-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.