Laserfiche WebLink
Loader Worksheet Cont'd Task # 214 Page 2 of 2 <br />Haul Route: <br />100 <br />0.00 <br />3.00 <br />3.00 <br />0.0564 <br />Cat HB <br />Return Route: <br />100 <br />0.00 <br />3.00 <br />3.00 <br />0.0564 <br />(Cat HB) <br />Total Travel Time: <br />0.1128 <br />minutes <br />Total Cycle Time: <br />0.5028 <br />minutes <br />Load Bucket Callacit <br />Rated Capacity: 1.80 <br />Bucket Fill Factor: 1.100 <br />Adjusted Capacity: 1.98 <br />Job Condition Correction Factors <br />Site Altitude: 5100 feet <br />LCY (heaped) <br />Other - rock/dirt mixtures (100-120%) 1.100 <br />LCY <br />Source <br />Altitude Adj: 0.95 CAT HB <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.79 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $0.403 <br />236.28 <br />186.30 <br />186.30 <br />Loader(s) Total job time: <br />/LCY Total job cost: <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />1.74 Hours <br />$131 <br />CIRCES Cost Estimating Software <br />