My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-10_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2020-07-10_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 11:58:13 AM
Creation date
7/15/2020 11:39:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/10/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Snowcap Coal Company
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
CCW
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: TR69 <br />Site: Roadside Portals <br />PROJECT IDENTIFICATION <br />MOTOR GRADER WORK <br />Permit Action: MT8 <br />Task #: 208 State: Colorado <br />Date: 7/8/2020 County: Mesa <br />User: CCW <br />Agency or organization name: DRMS <br />Permit/Job#: C1981041 <br />Abbreviation: None <br />Filename: C041-208 <br />HOURLY EQUIPMENT COST <br />acres <br />Basic Machine: CAT 14M <br />Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper <br />Shift Basis: 1 per day <br />Average Grader Speed: <br />1.50 <br />Data Source: (CRG) <br />Cost Breakdown: <br />Finish grading <br />(0-2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />Utilization % <br />Ownership Cost/Hour: <br />$65.89 <br />NA <br />Operating Cost/Hour: <br />$58.96 <br />100 <br />Ripper Ownership Cost/Hour: <br />$4.83 <br />NA <br />Ripper Operating Cost/Hour: <br />$4.40 <br />100 <br />Operator Cost/Hour: <br />$46.87 <br />NA <br />Total Unit Cost/Hour: <br />$180.95 <br />Altitude Adj: 1.00 (CAT HB) <br />Total Fleet Cost/Hour: <br />$180.95 <br />Net Correction: 0.9000 multiplier <br />MATERIAL OUANTITIES <br />Total Area to be graded or ripped: 0.40 <br />acres <br />Source of estimated acreage: TR69 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading <br />(0-2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 5100 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />1.6527 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.6527 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />0.24 Hours <br />Unit cost: $109.49 per acre <br />Total job cost: <br />$44 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.