Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 205 Page 3 of 3 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one-way travel distance: 25.00 miles <br />Average Travel Speed: 35.00 mph <br />Total Non-Roadable Mob/Demob Cost * $7,264.19 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: $391.23 <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): 0.71 0.71 <br />Return Time (Hours): 0.71 0.71 <br />Loading Time (Hours): 0.25 NA <br />Unloading Time (Hours): 0.25 NA <br />Subtotals: 1.93 1.43 <br />JOB TIME AND COST <br />Total job time: 3.86 Hours <br />Total job cost: $7,655 <br />CMCES Cost Estimating Software <br />