My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-13_HYDROLOGY - M1977342
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977342
>
2020-07-13_HYDROLOGY - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 4:49:24 AM
Creation date
7/15/2020 9:46:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
HYDROLOGY
Doc Date
7/13/2020
Doc Name
Water Monitoring - Groundwater
From
Climax Molybdenum
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO OPERATIONS <br /> ® Climax Molybdenum Henderson Mine <br /> A Freeport-McMoRan Company 1746 County Road 202 <br /> Empire, CO 80438 <br /> Phone(303)569-3221 <br /> July 8, 2020 <br /> Sent by UPS#: 1Z 804 641 NT 9383 5581 <br /> Mr. Peter Hays <br /> State of Colorado <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman St., Rm. 215 <br /> Denver, CO 80203 <br /> Re: Mine Groundwater NPL Exceedance Notification, Permit No. M-1977-342 <br /> Dear Mr. Hays: <br /> Henderson Mine is providing this written notification of an NPL exceedance for pH at groundwater point of <br /> compliance (POC)well MNGW-1, down gradient of the Henderson Mine, in accordance with Section 5.3 of <br /> the Henderson Groundwater Management Plan. This written notification is follow-up to the verbal <br /> notification that was made to you via voicemail on July 8, 2020. <br /> MNGW-1 was sampled during a normally scheduled monitoring event on June 11, 2020, with a pH value <br /> of 6.3 standard units (s.u.). This exceeded the numeric protection limit(NPL) of 6.5-8.5. As required by the <br /> Groundwater Management plan, a follow-up pH measurement was taken within 30 days on July 7, 2020, <br /> resulting in a pH of 6.2 s.u. <br /> These results do not appear to be anomalous or obvious outliers. If you have any additional questions or <br /> concerns, please feel free to contact me at 720-942-3420. <br /> Sincerely, <br /> 4Aaon�Hilsh9tA <br /> Chief Environmental Engineer <br /> Climax Molybdenum Company <br /> Henderson Operations <br /> cc (via email): <br /> M. Hamarat, Climax <br />
The URL can be used to link to this page
Your browser does not support the video tag.