My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-04_PERMIT FILE - C1981008A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2020-06-04_PERMIT FILE - C1981008A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2020 1:42:17 PM
Creation date
7/13/2020 1:20:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
6/4/2020
Doc Name
Topsoil Handling, Stockpiling and Redistribution
Section_Exhibit Name
Section 2.05.4(2)(d) Topsoil Handling, Stockpiling and Redistribution
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.0 Topsoil Suitability Criteria and Testing Plan for Reclaimed Soils <br />Prior to distribution of topsoil, all graded mined areas (on which topsoil is to be applied) will be <br />sampled to confirm spoil suitability (see Regraded Spoil Monitoring Plan in subsection 4.0 of <br />this section for more details). The density and physical characteristics of the replaced topsoil and <br />upper spoil will be observed. <br />The suitability criteria is required to ensure that no poor topsoil or Bench 1 is placed near the <br />surface of any reclaimed area and that prime farmlands are restored to strict standards for high <br />productivity. <br />Soil suitability criteria for all non -prime farmland areas west of 2700 Road are addressed in <br />Table 2.05.4(2)(d)-1. Soil suitability for prime farmlands is addressed is Section 2.06.6. <br />Depth measurements shall be taken at the same locations as the original sample sites. The topsoil <br />salvage and replacement depth information will be kept on file at the mine office and will be <br />submitted with the Annual Topsoil Balance/Spoil Quality Report to DRMS. Topsoil recovery <br />depths will be adjusted if warranted by the site conditions. Sample frequency is as shown in the <br />table for each material type. <br />15.0 Topsoil Remediation Plans <br />In the event that any one soil sample result exceeds the limits, New Horizon will implement the <br />topsoil remediation plan below. <br />If one or more parameters fall within the unsuitable range at a given grid point, a three-part <br />mitigation plan will be implemented. <br />1. The area around a suspect hole will be sampled on a closer spacing interval in order to <br />better define the lateral extent and variability of the unsuitable material. This sampling <br />will be called the 2nd Phase sampling and the interval is one hole per 50 feet distance <br />around the bad point in all directions for prime farmland, and one hole per 100 feet <br />distance around the bad point in all directions for reclaimed irrigated pastureland and <br />dryland pasture. <br />2. If 2nd phase sampling shows an exceedance, follow-up sampling will take place to <br />delineate the area of exceedance. Delineated areas of exceedance that are larger than 0.1 <br />acres for prime farmland, 0.25 acres for reclaimed irrigated pastureland or 0.50 acres for <br />dryland pasture will be remediated. <br />July 2018 (TR -84) 2.05.4(2)(d)-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.