Laserfiche WebLink
Drainage <br /> The Lincoln Street Haul Road will utilize existing ditches and culverts to provide adequate <br /> drainage. The water control system has been designed to safely pass peak runoff from a 10-year, <br /> 24-hour precipitation event. Refer to Attachment 2.05.3(3)-1 for culvert and ditch designs. <br /> Sur acro <br /> The Lincoln Street Haul Road is an existing road that is currently surfaced with sufficiently <br /> durable material (rock, gravel) for the volume of traffic and weight and speed of vehicles used. <br /> Acid- or toxic-forming substances will not be used for surfacing. <br /> Maintenance <br /> The Lincoln Street Haul Road will be maintained such that required standards are met <br /> throughout the life of the facility. Maintenance will include blading, replacement of surfacing <br /> material, brush removal, and watering for dust control. Other commercial products may be <br /> utilized for fugitive dust control and will be applied according to manufacturer recommendation. <br /> Reclamation <br /> Unless the Division approves retention of the Lincoln Street Haul Road as part of the postmining <br /> land use, the road will be reclaimed in accordance with 4.03.1(7) after it is no longer needed. <br /> L Access Roads <br /> Under the definition of Access Road provided in Section 1.04 of the Rules, there are no access <br /> roads within the permit area. <br /> J. Light-Use Roads <br /> Under the definition of Light-Use Road provided in Section 1.04 of the Rules,there are no light- <br /> use roads within the permit area. <br /> K. Support Facilities <br /> Buildings <br /> Map 2.05.3(3)-1 shows the locations of the existing buildings. Details of sizes and types of <br /> construction for all buildings are shown on Table 2.05.3(3)-4. See Attachment 2.05.3(3)-17 for <br /> landowner letters retaining buildings as permanent structures. <br /> Section 2.05.3(3) Page 14 July 2020 (TR-99) <br />