Laserfiche WebLink
Laborato Parameters Cont. <br />Groundwater Surface Water Units <br />Nitrogen as Nitrite Nitrogen as Nitrite m /I <br />Phosphate as PO Phosphate as PO m /I <br />Potassium Potassium m g/1 <br />Selenium dis. Selenium dis. ug/I <br />Sodium dis. Sodium dis. mg/I <br />Sodium Adsorption Ratio Sodium Adsorption Ratio <br /> Sulfide tot. rec. mg/I <br />Sulfate dis. Sulfate dis. m /I <br />Cation/Anion Balance Cation/Anion Balance percent <br />Total Dissolved Solids @ 180°c Total Dissolved Solids 180°c TDS mg/I <br />Total Dissolved Solids, <br />Calculated Total Dissolved Solids, Calculated mg/1 <br /> Total Suspended Solids TSS mg/I <br />Groundwater Monitoring - New Horizon 2 Mine <br />In anticipation of the New Horizon Mine's migration to the west-northwest and toward an area not <br />currently being monitored for groundwater parameters, WFC submitted a minor revision application <br />(MR41) to DMG for the installation of six groundwater monitoring wells, three up dip (northeast <br />corner) and three down dip (southwest corner) of the projected future areas of disturbance. See <br />Map 2.04.7-1-A. WFC has also submitted a technical revision applications (TR-38, TR-47) to revise <br />the hydrological monitoring program as follows: <br />Begin monitoring of the six new groundwater wells (GW-N41, GW-N42 and GW-N43 up dip, <br />and GW-N44, GW-N45 and GW-N46 down dip). Table 2.04.7-1 shows the frequency and <br />parameters to be monitored. <br />2.04.7-54