My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-04_PERMIT FILE - C1981008 (39)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2020-06-04_PERMIT FILE - C1981008 (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 9:59:05 AM
Creation date
7/9/2020 1:31:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Permit File
Doc Date
6/4/2020
Doc Name
Geology Description
Section_Exhibit Name
Section 2.04.6 Geology Description
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• List of Tables <br />Table 2.04.6-1 <br />Coal Seam Analysis Data For The New Horizon 2 <br />Montrose County, Colorado ................ . <br />Table 2.04.6-2 <br />Permit Area <br />...........................12 <br />Parameter, Procedure, Aand Reference List For Phase I And Phase II <br />Sampleing At The Proposed New Horizon 2 Mine <br />Montrose County, Colorado -March, 1988 ............................... . . 26 <br />Table 2.04.6-3 <br />Criteria For Evaluating Overburden, Interburden, Underburden, <br />Regraded Spoils Suitability <br />New Horizon 2, Montrose County, Colorado -March 1998 ..................... 30 <br />Table 2.04.6-4 <br />Chemical And Physical Properties of Overburden Sandstone And Shale(unit 1) For <br />Phase 1 And Phase ii Samples Collected In The New Horizon 2 Study Area ....... 34 <br />Table 2.04.6-5 <br />Chemical And Physical Properties Of Upper Dakota Coal Seam And Encompassing <br />Very Dark Gray Shale (unit 2) For Phase 1 And Phase ii Samples Collected In The New <br />Horizon 2 Study Area, Montrose County, Colorado ........................... 35 <br />Table 2.04.6-6 <br />Chemical And Physical Properties Of The Inner Interburden Sandstone (unit 3) For <br />Phase 1 and Phase ii Samples Collected In The New Horizon 2 Study Area, Montrose <br />County,Colorado .....................................................36 <br />• Table 2.04.6-7 <br />Chemical and Physical Properties Of The Inner Interburden Shale (Unit 4) For Phase 1 <br />And Phase ii Samples Collected In The New Horizon 2 Study Area, Montrose County, <br />Colorado ...........................................................37 <br />Table 2.04.6-8 <br />Chemical And Physical Properties Of The Inner Underburden Sandstone (unit 6) For <br />Phase 1 Samples Collected From The New Horizon 2 Study Area, Montrose County, <br />Colorado ...........................................................38 <br />Table 2.04.6-9 <br />Additional Chemical Parameters Required By CDMG For Phase I Drill Hole 870e, <br />New Horizon 2 Study Area, Montrose County, Colorado ....................... 41 <br />Table 2.04.6-10 <br />Chemical And Physical Properties Of Overburden, Interburden And Underburden For <br />Phase I And Phase ii Samples Collected In The <br />New Horizon 2 Study Area, Montrose County, Colorado ....................... 42 <br />L J <br />Attachments <br />REVISED August 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.