Laserfiche WebLink
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02200 REV D ■ <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> March 13,2020 <br /> G. Soil Liner Fill <br /> 1. Soil Liner Fill shall be placed within the limits of the valley leach facility as shown on <br /> the DRAWINGS and shall begin only after completion of all, or MANAGER and <br /> CERTIFYING ENGINEER approved portion of,excavation and Structural Fill placement <br /> in the valley leach facility. <br /> 2. CONTRACTOR shall process, place and compact the Soil Liner Fill to achieve a <br /> coefficient of permeability of less than 1x10-6cm/sec, measured according to ASTM <br /> Method D5084, Method D. Any Soil Liner Fill not meeting the permeability <br /> specification shall be removed and replaced with material meeting the permeability <br /> specification, at no additional cost to CC&V. <br /> 3. CONTRACTOR shall place and compact the Soil Liner Fill in loose lifts such that the <br /> compacted lift thickness is a minimum of 12-inches. <br /> 4. CONTRACTOR shall compact the Soil Liner Fill to at least 95 percent of the maximum <br /> dry density as determined by the Standard Proctor density test (ASTM D698). The <br /> moisture content shall be within +3%to-2%of the optimum moisture content. Both <br /> moisture and density shall be uniform throughout the lift. If the Soil Liner Fill cannot <br /> be conditioned to meet the placement specifications, the material shall be removed <br /> and replaced with new Soil Liner Fill at the CONTRACTOR's expense. The <br /> CONTRACTOR shall reduce the clod size of the soil liner fill to a size that is acceptable <br /> to the CERTIFYING ENGINEER,the method by which will be approved by CERTIFYING <br /> ENGINEER and MANAGER prior to implementation. <br /> 5. The moisture content of the Soil Liner Fill shall be uniform throughout prior to and <br /> during compaction of the material. CONTRACTOR shall be responsible for meeting <br /> moisture content and compaction SPECIFICATIONS. If the Soil Liner Fill cannot be <br /> conditioned to meet the placement SPECIFICATIONS, the material shall be removed <br /> and replaced with new Soil Liner Fill at no additional cost to CC&V. MANAGER may <br /> require CONTRACTOR to moisture condition Soil Liner Fill at stockpile at least 24 <br /> hours prior to the Soil Liner Fill being placed. <br /> 6. CONTRACTOR shall place Soil Liner Fill to form a continuous monolithic material. If a <br /> lift of compacted Soil Liner Fill dries out during placement operations, CONTRACTOR <br /> shall scarify, moisture condition the dry soil and recompact the lift. If a lift of <br /> compacted Soil Liner Fill becomes overly wet due to precipitation or over watering, <br /> CONTRACTOR shall allow the wet soil to dry to the specified moisture content range <br /> before recompaction of fill and placement of geosynthetic materials. <br /> 7. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. Soil <br /> Liner Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to facilitate <br /> CQA field testing. <br /> 8. CONTRACTOR shall maintain Soil Liner Fill stockpile areas in a free-draining <br /> condition. The CONTRACTOR will maintain Soil Liner Fill stockpiles and Soil Liner Fill <br /> Page 15 <br />