My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M1980244 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-07-08_REVISION - M1980244 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 2:35:35 AM
Creation date
7/9/2020 8:15:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/8/2020
Doc Name
VOL 2-Phase 2A, Part 3(1 OF 2)
From
CC&V
To
DRMS
Type & Sequence
TR122
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02200 REV D <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> March 13,2020 <br /> A. Stripping of the topsoil shall be done within the entire area of the stripping limits. <br /> B. CONTRACTOR shall excavate and remove topsoil in a manner that will minimize <br /> contamination with other soil horizons, and will take such measures as are necessary to <br /> ensure that the removal of topsoil does not result in erosion or excessive sedimentation. <br /> C. CONTRACTOR shall stockpile topsoil at locations designated by MANAGER. Stored topsoil <br /> shall not be disturbed by mining, leaching operations, or construction activities, and shall <br /> be protected from wind and water erosion, compaction, and contamination. <br /> D. CONTRACTOR shall grade topsoil stockpiles to prevent erosion and ponding of <br /> precipitation in the stockpile areas. The maximum topsoil stockpile height will be <br /> approved by MANAGER.The CONTRACTOR shall protect stockpiled topsoil by an effective <br /> cover of non-noxious, quick- growing, annual, and perennial plants, approved by <br /> MANAGER, which shall be seeded or planted during the first appropriate growing season <br /> after removal. <br /> 3.3. Waste Removal <br /> Waste material is defined as material too wet, too dry, frozen or containing ice or snow, <br /> containing organic or other deleterious matter, having poor characteristics of grading or <br /> compaction, having other characteristics that may result in undesirable settlement or other <br /> movement of the fill, or within the fill, or otherwise not meeting the requirements of the <br /> SPECIFICATIONS, provided that this definition permits drying, water, and any other processing or <br /> reprocessing to make the material stable and suitable prior to incorporating it into the fill as <br /> permitted in the SPECIFICATIONS or by the MANAGER and CERTIFYING ENGINEER. <br /> A. CONTRACTOR shall excavate and remove waste in a manner that will minimize <br /> contamination with other soil horizons. <br /> B. CONTRACTOR shall stockpile removed waste at locations designated by MANAGER <br /> 3.4. Excavation <br /> A. CONTRACTOR shall perform excavation to the lines and grades shown on the DRAWINGS <br /> or as directed by MANAGER. No excavation shall begin until the CONTRACTOR has <br /> provided construction staking for the proposed work. <br /> B. CONTRACTOR shall prevent the disturbance of surrounding areas during excavation. <br /> Where selective excavations are required to obtain materials for Structural Fill and Select <br /> Structural Fill, the material removed from the excavations shall be taken directly to the <br /> fill areas or, if required, stockpiled by material types.The stockpiles shall be approved by <br /> MANAGER. <br /> C. CONTRACTOR shall grade all excavations to ensure grades are maintained to provide <br /> adequate drainage at all times. Work shall be suspended by CONTRACTOR when, in the <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.