Laserfiche WebLink
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02200 REV D <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> March 13,2020 <br /> 6. Soil Liner Fill - processed materials as approved by MANAGER and CERTIFYING <br /> ENGINEER, conforming to the following SPECIFICATION: <br /> U.S.Standard Percent Passing <br /> Sieve Size by Dry Weight <br /> 2-inch 100 <br /> No. 200 15—65 <br /> Point load tensile strength: >300 psi <br /> Plasticity Index: 10 <br /> Minimum Hydraulic Conductivity 1x10-6 cm/s maximum <br /> 7. Drain Cover Fill - material approved by MANAGER and CERTIFYING ENGINEER <br /> conforming to the following SPECIFICATIONS: <br /> U.S.Standard Percent Passing <br /> Sieve Size by Dry Weight <br /> 1%-inch 100 <br /> %-inch 70—100 <br /> No.4 5—50 <br /> No. 200 0-8 <br /> Plasticity Index:Non Plastic <br /> The MANAGER substitute crushed ore as Drain Cover Fill. The crushed ore material <br /> shall conform to the following SPECIFICATIONS: <br /> U.S.Standard Percent Passing <br /> Sieve Size by Dry Weight <br /> 3-inch 100 <br /> 2-inch 97 <br /> %-inch 40—100 <br /> No.4 5—35 <br /> No.200 0-8 <br /> Plasticity Index: Non Plastic <br /> 8. Select Drain Cover Fill — material as approved by MANAGER and CERTIFYING <br /> ENGINEER conforming to the following SPECIFICATIONS: <br /> Page 4 <br />