My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M1980244 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-07-08_REVISION - M1980244 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 2:35:35 AM
Creation date
7/9/2020 8:15:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/8/2020
Doc Name
VOL 2-Phase 2A, Part 3(1 OF 2)
From
CC&V
To
DRMS
Type & Sequence
TR122
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01400-2.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> August 25,2016 <br /> ■ date, project name, and location; <br /> • summary of construction related activities, <br /> ■ summary of geomembrane deployed (per day); <br /> ■ summary of samples taken and test results; <br /> ■ summary of geomembrane areas completed, and approved for Drain Cover Fill placement; <br /> ■ summary of deficiencies and/or defects and resolutions; and <br /> • signature of the CQA Monitor. <br /> 7.6. Construction Certification Report <br /> At the completion of the project, the CQA Monitor shall submit to the MANAGER a <br /> Construction Certification Report. This report shall certify that the work has been performed <br /> in compliance with the design DRAWINGS and project SPECIFICATIONS and will contain the <br /> following information: <br /> • summary of all construction activities; <br /> ■ observation and test data sheets; <br /> • photographic documentation; <br /> ■ CQA staff scheduling; <br /> • copies of weekly reports; <br /> • CONTRACTOR'S subgrade acceptance forms; <br /> • temperature monitoring results; <br /> • geosynthetic quality control documents; <br /> • geosynthetic quality assurance documents; <br /> ■ geomembrane installation observations, such as for deployment, trial seams, defect <br /> repair, destruct testing and non-destructive testing; <br /> • sampling, testing locations, and test results; <br /> • changes to the design DRAWINGS or project SPECIFICATIONS and the justification for <br /> these changes; <br /> • record DRAWINGS; and <br /> • a certification statement that construction was completed in compliance with the <br /> DRAWINGS and SPECIFICATIONS, signed, and sealed by the CERTIFYING ENGINEER <br /> registered in the State of Colorado. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.