My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M1980244 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-07-08_REVISION - M1980244 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 2:35:35 AM
Creation date
7/9/2020 8:15:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/8/2020
Doc Name
VOL 2-Phase 2A, Part 3(1 OF 2)
From
CC&V
To
DRMS
Type & Sequence
TR122
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01400-2.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> August 25,2016 <br /> sample to a third party geosynthetic laboratory. As a minimum, the following conformance <br /> tests shall be conducted; with project requirements outlined in Section 02776, Article 2.01: <br /> ■ Geomembrane: density (ASTM D1505) <br /> carbon black content (ASTM D1603) thickness (ASTM D5199/D5994) <br /> tensile strength (ASTM D6693) <br /> All conformance tests shall be performed in compliance with the project SPECIFICATIONS. <br /> The CQA Monitor shall review the test results and shall report any nonconformance to the <br /> MANAGER, CERTIFYING ENGINEER and the Geosynthetics Installation CONTRACTOR. <br /> 6.3. Construction Monitoring And Testing <br /> The CQA Monitor shall monitor and test all geosynthetic components of the construction to <br /> verify that the construction is in compliance with the project SPECIFICATIONS. The CQA <br /> Monitor shall identify inadequate construction methodologies or materials which may <br /> adversely impact the performance of the facility being constructed and existing structures. <br /> Visual observations throughout the construction process shall be made to ensure that the <br /> materials are placed to the lines and grades as shown on the DRAWINGS. <br /> The CQA monitor shall review the following submittals by INSTALLER during the project: <br /> ■ verification that a qualified land surveyor has verified all lines and grades; and <br /> • subgrade surface acceptance certificates for each area to be covered by the lining <br /> system, signed by the INSTALLER. <br /> The CQA Monitor shall: <br /> • Inspect all geosynthetic materials delivered to site. The CQA Monitor shall document any <br /> damage and notify MANAGER; <br /> ■ obtain geosynthetic packaging identification slips for verification and generation of an on- <br /> site materials inventory; <br /> • observe subgrade conditions prior to geosynthetics installation and verify that any <br /> deficiencies, as defined in Section 02200 of the SPECIFICATIONS, are corrected; <br /> • observe permanent anchoring of geosynthetics to verify that design and project <br /> SPECIFICATIONS are met; observe that required overlap distances are met; <br /> • monitor and record ambient air temperatures; <br /> ■ verify that no continuous horizontal seams are placed on slopes unless approved by <br /> ■ CERTIFYING ENGINEER; and <br /> ■ observe and document that all soil materials placed on top of the geosynthetics are done <br /> in such a manner as to ensure that the geosynthetics are not damaged. <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.