My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M1980244 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-07-08_REVISION - M1980244 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 2:35:35 AM
Creation date
7/9/2020 8:15:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/8/2020
Doc Name
VOL 2-Phase 2A, Part 3(1 OF 2)
From
CC&V
To
DRMS
Type & Sequence
TR122
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine ■ <br /> Technical Specification No.01400-2.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> August 25,2016 <br /> with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING ENGINEER will be <br /> responsible for the resolution of all quality assurance issues. <br /> 2.5. Construction Quality Assurance Monitor <br /> The Construction Quality Assurance Monitor, also referred to as the "CQA Monitor", is the <br /> firm or individual responsible for performing the CQA tasks outlined in this plan. The CQA <br /> Monitor is the official CQA representative of CC&V and has the responsibility of overseeing the <br /> CQA aspects of the project. In this CQA Plan the CQA Monitor is associated with the <br /> CERTIFYING ENGINEER and refers specifically to (To Be Determined). The CQA Monitor has <br /> the authority to stop any aspect of the work that is not in compliance with the CQA Plan. <br /> Work would then be resumed once corrective action has been approved by the MANAGER <br /> and CERTIFYING ENGINEER. The specific responsibilities of the CQA Monitor include: <br /> ■ review the design DRAWINGS, project SPECIFICATIONS, and related guidance documents; <br /> ■ review all CONTRACTOR QC submittals and make appropriate recommendations; <br /> • observe geosynthetic material delivery, unloading, and storage; <br /> • obtain and test geosynthetic conformance samples during geosynthetics manufacture; <br /> ■ observe prepared subgrade prior to geosynthetic deployment; <br /> • monitor and document geosynthetic material placement, trial seam testing, non- <br /> destructive testing, seaming and repair operations, and destructive testing; <br /> • identify seam samples for CQA destructive testing; <br /> ■ assure that testing equipment used, and tests performed are conducted according to <br /> project SPECIFICATIONS and industry standards; <br /> • perform or observe, document, and report test results to MANAGER as required; <br /> • report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br /> Monitor, including design or project SPECIFICATION changes; and <br /> ■ prepare a Construction Certification Report describing the construction, any deviations <br /> from SPECIFICATIONS or, DRAWINGS and details, details of all field and laboratory <br /> details, subgrade acceptance forms, test data, tests results (both laboratory and field), QC <br /> submittals, geomembrane panel layout as-built prepared by the CQA Monitor, professional <br /> certification that construction was completed in compliance with the DRAWINGS and <br /> SPECIFICATIONS. The report will be signed and sealed by the CERTIFYING ENGINEER <br /> registered in the State of Colorado. <br /> 2.6. Geosynthetics Manufacturer <br /> The Geosynthetics Manufacturer, also referred to as the "MANUFACTURER", is responsible for <br /> production of the geosynthetic components outlined in this plan. Each MANUFACTURER <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.