My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M1980244 (20)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-07-08_REVISION - M1980244 (20)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 4:59:49 AM
Creation date
7/9/2020 8:13:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/8/2020
Doc Name
VOL 1-Phase 2A, Part 3
From
CC&V
To
DRMS
Type & Sequence
TR122
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmoi t. <br /> Nevvrnont Whrm5y Corporation <br /> -C .,\fir,. C, r <br /> r-4, <br /> July 7, 2020 <br /> HAND-DELIVERED HARD COPY <br /> Mr. Timothy Cazier, P.E. <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation,Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No.M-1980-244; Cripple Creek& Victor Gold Minine Company; Cresson Project;— <br /> Technical Revision 122—VLF 2 Phase 2A,Part 3 Record of Construction—Construction <br /> Ouality Assurance Report <br /> Dear Mr. Cazier: <br /> Newmont Corporation's Cripple Creek and Victor Gold Mining Company (CC&V) hereby provides <br /> Technical Revision (TR) 122; requesting approval of the Squaw Gulch Valley Leach Facility Phase 2A, <br /> Part 3 Construction Quality Assurance Monitoring and Test Report. The report, completed by NewFields <br /> on July 2, 2020 is enclosed as an attachment to this submission. Upon DRMS approval of the report, <br /> leaching of the Phase 2A, Part 3 area of the VLF will begin. <br /> This report details work associated with the Cresson Project that was performed under specific criteria <br /> established in Amendment No. 10 of Permit No.M-1980-244,as approved by the Mined Land Reclamation <br /> Board. Construction Quality Assurance and Construction Quality Control services are documented in the <br /> report through June 2020 for Phase 2A, Part 3 of the Squaw Gulch VLF. <br /> As DRMS is aware, TR 117 - Phase 2A, Part 1 was approved by DRMS on Aug 30, 2019, and generally <br /> included the western half of Phase 2A. TR 118 - Phase 2A, Part 2 was approved on Oct 29. 2019, and <br /> expanded the lined area east along the 9950 bench. Phase 2A, Part 3, included in this report as TR 122, <br /> finishes the area designated as Phase 2A, and is shown on Figure 2 of the enclosed report. <br /> In addition to this hand-delivered hard copy,CC&V has placed this report on our ShareFile site for review. <br /> Check number 2000045477 was mailed to the DRMS office via USPS,tracking number 858813005 on <br /> June 30, 2020. Should you require further information please do not hesitate to contact Katie Blake at <br /> 719-689-4048 or katie.blake a,newmont.com or me at(719)689-4042 or Justin.Ra lin @newmont.com. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.