My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M1980244 (20)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-07-08_REVISION - M1980244 (20)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 4:59:49 AM
Creation date
7/9/2020 8:13:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/8/2020
Doc Name
VOL 1-Phase 2A, Part 3
From
CC&V
To
DRMS
Type & Sequence
TR122
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 3 <br /> Record of Construction Report ■ <br /> 475.0106.032 <br /> July 2,2020 <br /> the 3/-inch sieve. Density was achieved by placing the material in accordance with the <br /> method compaction specifications presented in Appendix D. <br /> 3.2.2. Soil Liner Fill <br /> The Squaw Gulch VLF Phase 2A Part 3 area was constructed by placing 11,226 cy of SLF. <br /> The particle size distribution, Atterberg limits, laboratory compaction, and permeability <br /> testing frequencies were one sample for every 4,000 cy. A minimum of three SLF record <br /> samples were required to be tested for particle size distribution, Atterberg limits, <br /> laboratory compaction,and permeability testing.A total of three SLF record samples were <br /> tested with passing results. SLF laboratory testing is summarized in Table 6 and individual <br /> test results are presented in Appendix H.2. <br /> The nuclear density/moisture testing frequency for SLF is one test for every 500 cy. A <br /> minimum of twenty three SLF nuclear density/moisture tests were required. A total of <br /> twenty seven SLF nuclear density/moisture tests were performed with passing results. <br /> The depth check frequency for SLF is two checks for every acre. A minimum of seven SLF <br /> depth checks were required. A total of twenty seven SLF depth checks were performed <br /> with passing results. SLF nuclear density/moisture testing and SLF depth checks are <br /> presented in Tables 9 and 10, respectively. <br /> 3.2.3. Drain Cover Fill <br /> The Squaw Gulch VLF Phase 2A Part 3 area was constructed by placing 22,452 cy of DCF. <br /> The particle size distribution and Atterberg limits testing frequencies were one sample for <br /> every 20,000 cy. A minimum of two DCF samples were required to be tested for particle <br /> size and Atterberg limits.A total of five DCF samples were tested with passing results. DCF <br /> laboratory testing is summarized in Tables 7 and 8 and individual test results are <br /> presented in Appendix H.3 and Appendix H.4. <br /> 3.3. Geosynthetics Quality Control Submittals <br /> The CQA Monitor reviewed and approved all geosynthetic QC submittals, including <br /> geomembrane installation personnel resumes,geomembrane roll QC certificates,geomembrane <br /> resin QC certificates, and welding rod QC certificates.The CQA Monitor tracked all geomembrane <br /> delivered to site in the site inventory. The site inventory, for all geomembrane used within the <br /> Phase 2A Part 3 area, is presented in Appendix 1.1. <br /> 3.3.1. Geomembrane Installation Personnel Resumes <br /> Tetra Tech submitted the resumes of all installation personnel prior to construction or <br /> repair activities within the Squaw Gulch VLF Phase 2A Part 3 area. The CQA Monitor <br /> verified that the Installation Superintendent, Master Seamer and QC Inspector possessed <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\1-REPORTS\Cert Report-Phase 2A Part 3\475.0106.032 CCV PHASE 2A Part 3 ROC <br /> REPORT.docx <br /> Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.