Laserfiche WebLink
oF.Soto ppTROI <br /> COLORAE �G AND SAFETY <br /> * *` 1313 � JPU'le 6-3567 <br /> J <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- :�;710A9 —/00 Site Name: L,3:��c'oe 1A,1e_4'jG/do 604 ZDIT <br /> County �� TR# (DRMS Use only) <br /> Permittee: Ffou1t. / RECEIVED <br /> Operator(If Other than Permittee): A,111k, <br /> JUL 0 8 2020 <br /> DIVISION OF RECLAMATION <br /> Permittee Representative: 1+1"g11 t�Q,2-_ MINING&SAFETY <br /> Please provide a brief description of the proposed revision: Wk,[jjW1d f-D 1 /16re'cz5� <br /> V Ce 11 '+pe /l crhr� "a41,4blt-, <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or , <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted �Oc oq <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> o ` <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the Q N <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to o O <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will % __adetermine if it is approvable within 30 days. If the Division requires additional information to approve a v a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 0 '� p <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the o <br /> permittee requests additional time, in writing,to provide the required information. Cn <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> 0 <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with o I� <br /> your request for a Technical Revision. I[ o O <br /> cD N v <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />