My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M2010004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010004
>
2020-07-08_REVISION - M2010004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 7:25:44 AM
Creation date
7/9/2020 7:00:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010004
IBM Index Class Name
REVISION
Doc Date
7/8/2020
Doc Name
Request for Technical Revision
From
Frank Leone
To
DRMS
Type & Sequence
TR1
Email Name
JPL
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oF.Soto ppTROI <br /> COLORAE �G AND SAFETY <br /> * *` 1313 � JPU'le 6-3567 <br /> J <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- :�;710A9 —/00 Site Name: L,3:��c'oe 1A,1e_4'jG/do 604 ZDIT <br /> County �� TR# (DRMS Use only) <br /> Permittee: Ffou1t. / RECEIVED <br /> Operator(If Other than Permittee): A,111k, <br /> JUL 0 8 2020 <br /> DIVISION OF RECLAMATION <br /> Permittee Representative: 1+1"g11 t�Q,2-_ MINING&SAFETY <br /> Please provide a brief description of the proposed revision: Wk,[jjW1d f-D 1 /16re'cz5� <br /> V Ce 11 '+pe /l crhr� "a41,4blt-, <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or , <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted �Oc oq <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> o ` <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the Q N <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to o O <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will % __adetermine if it is approvable within 30 days. If the Division requires additional information to approve a v a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 0 '� p <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the o <br /> permittee requests additional time, in writing,to provide the required information. Cn <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> 0 <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with o I� <br /> your request for a Technical Revision. I[ o O <br /> cD N v <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.