Laserfiche WebLink
King II Appendix 11 - Hydrologic Designs <br /> King II Mine Site Hydrology Analysis - Introduction Document 11(1) <br /> SEDCAD Hydrology Model Tables (TR-29) 11(1A) <br /> SEDCAD Drainage Basin A to Pond 1 Flows Modified for King III 11(1B) <br /> Portals (TR-29). Flegal 04/29/2020 <br /> (SEDCAD Ditch CWD-lA SEDCAD As-Built (Stations 0+00 to 18+95 11(1C) <br /> (Culvert C-3 to CWD-2). Chlopek 12/03/2015 <br /> (SEDCAD Ditch CWD-lA SEDCAD As-Built (Stations 18+95 to 24+01) <br /> Upstream flows from CWD-1 B to CWD-2 via Culvert C-2. Chlopek 11(1 D) <br /> 06/29/2015 <br /> SEDCAD CWD-1C and CWD-1D As-Built to CWD-2 via cattle guard. 11(1E) <br /> Chlopek 06/29/2015 <br /> Revised East Clearwater Diversion (CWD-2): Modified for 2020 Portal. 11(1F) <br /> Flegal 05/01/2020 (TR-29) <br /> SEDCAD Pond 1 Flows to Outlet. Chlopek 06/29/2015 11(1G) <br /> Safety Factor Analysis for Sediment Pond, Environmental Industrial 11(5) <br /> Services, November, 2009 <br /> "As-Built" Pond Certification, Fleming Engineering, September 15, 11(6) <br /> 2009 <br />