My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-06_REVISION - M1984041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2020-07-06_REVISION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 4:29:06 AM
Creation date
7/7/2020 8:05:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
REVISION
Doc Date
7/6/2020
Doc Name
Request For Amendment To Permit
From
American Gypsum Co.
To
DRMS
Type & Sequence
AM4
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 Plan of Operations Modification American Gypsum Company, LLC <br /> 6.13.2 Approach/Procedure for Characterization <br /> During active mining,the rotomill grinds layers of gypsum and intraburden in approximately 6-inch <br /> layers. Intraburden is typically intermixed with gypsum, clearly identified by the distinct color <br /> variation. Gypsum is white in color while intraburden is a darker tan/brown color. Equipment <br /> operators (reporting to the Mine Superintendent) are responsible for segregating materials into <br /> separate stockpiles within the active pit, which are loaded and hauled to American Gypsum's <br /> wallboard plant (gypsum) or used for progressive reclamation, access road construction, or <br /> stockpiled within inactive portions of the Lower Pit, Upper Pit, and East Pit for final reclamation <br /> (intraburden/overburden). <br /> 6.13.3 Waste Rock (Intraburden/Overburden) Management Plan <br /> Overburden is defined as material above the East Pit gypsum with little to no gypsum content, <br /> ranging in depth from 0 feet to 82 feet (using drilling data). Overburden would be removed during <br /> pre-production prior to active mining in the East Pit only. Intraburden is defined as inert, non- <br /> economic material to be removed during the East Pit and Upper Pit progression. <br /> 6.14 Quality Assurance Plan for Proposed Activities <br /> A Quality Assurance Plan (QAP) is included as Appendix C.The QAP covers activities associated <br /> with culvert installation (including bedding, backfilling, and erosion controls) and road <br /> construction. <br /> 6.15 Spill Contingency Plan <br /> Gypsum is processed into wallboard directly at the plant; there are no on-site processing facilities <br /> and therefore no processing chemicals or acid-producing materials used or stored at the Mine. <br /> During operations, care would be taken to ensure that no oil, fuel, or lubricants are discharged <br /> onto the ground. Any spills or discharges would immediately be reported to the BLM, followed by <br /> prompt cleanup and remediation. Spills would be reported and managed according to American <br /> Gypsum's SPCC Plan (Environmental Solutions, 2019). <br /> 6.16 Monitoring and Inspections <br /> Monitoring (surface and groundwater quality and quantity, air quality, revegetation, stability, noise <br /> levels, etc.) would be conducted as required by existing approvals. Revegetation monitoring is <br /> discussed in Section 7.7. <br /> Throughout operation, American Gypsum would perform additional inspections according to <br /> Table 6.7. <br /> Am Gypsum Poo Mod ISSD 20190909 September 2019 [321 <br />
The URL can be used to link to this page
Your browser does not support the video tag.