Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use(check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Continuous mining by use of Wirtgen 220SM roto-mills. <br /> 15. On Site Processing: F1 Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g. truck/shovel): <br /> 25 ton haul trucks loaded by a loader. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> N/A <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> American Gypsum's um's proposed mining activities would consist of increasing the Upper Pit <br /> disturbance footprint, developing a new pit referred to as the East Pit, and constructing new haul <br /> roads. After the Upper Pat is maned to its current permitted footprint, American Gypsurn would— <br /> begin the expansion of the Upper Pit. American Gypsum plans to begin developing the East Pit <br /> in 2021. New haul roads would be constructed to access the Upper Pit expansion and East Pit <br /> areas <br />