Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 3 of 143 <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />4.25 <br />5.00 <br />CONTINGENCY: 0.00 <br />Total = $31,756.90 <br />$37,361.06 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $197,148.07 <br />TOTAL BOND AMOUNT (direct + indirect) _ $816,839.07 <br />CIRCES Cost Estimating Software <br />