Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 34 of 143 <br />Task description: <br />Site: King Coal Mine <br />BULLDOZER WORK <br />I - Push 3.5' cover to refuse l <br />Permit Action: RN7 <br />PROJECT IDENTIFICATION <br />Task #: 015 State: Colorado <br />Date: 5/4/2017 County: La Plata <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $199.38 <br />Total Fleet Cost/Hour: $199.38 <br />Permit/Job#: C1981035 <br />Abbreviation: None <br />Filename: C035-015 <br />$83.81 <br />Utilization % <br />NA <br />$66.17 <br />100 <br />$7.55 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />MATERIAL QUANTITIES <br />Initial Volume: 6,098 <br />Swell factor: 1.000 <br />Loose volume: 6,098 LCY <br />Source of estimated volume: 3.5' depth on 1.08 acres <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push 25% <br />gradient: <br />Average site altitude: 7,400 feet <br />Material weight: 2,900 lbs/LCY <br />100 feet <br />852.6 LCY/hr <br />Partly consolidated stockpile 1.1 <br />CIRCES Cost Estimating Software <br />