Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 24 of 143 <br />Task description: King I - <br />Site: King Coal Mine <br />PROJECT IDENTIFICATION <br />MOTOR GRADER WORK <br />and final grade lower facilities area <br />Permit Action: RN7 <br />Task #: 010 State: Colorado <br />Date: 5/4/2017 County: La Plata <br />User: JHB <br />Agency or organization name: DRMS <br />Permit/Job#: C1981035 <br />Abbreviation: None <br />Filename: C035-010 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 12M Horsepower: 158 <br />Ripper Attachment: Multi -Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$28.02 <br />NA <br />Operating Cost/Hour: <br />$28.28 <br />100 <br />Ripper Ownership Cost/Hour: <br />$1.99 <br />NA <br />Ripper Operating Cost/Hour: <br />$2.16 <br />100 <br />Operator Cost/Hour: <br />$28.90 <br />NA <br />Total Unit Cost/Hour: <br />$89.35 <br />Total Fleet Cost/Hour: $89.35 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />1.18 <br />TR -9 submittal <br />1.25 mph <br />Production Deration - 1.25 <br />30 <br />10.40 <br />2.00 <br />8.40 <br />1.2727 <br />degrees <br />feet <br />feet <br />feet <br />acres/hour <br />Site Altitude: 7400 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 (1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: 1.0818 acres/Hour <br />Adjusted Hourly Fleet Production: 1.0818 acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 1.09 <br />acres <br />Hours <br />CIRCES Cost Estimating Software <br />