Laserfiche WebLink
Demo Worksheet Cont'd <br />Truck Travel (Haul & Return) Time: <br />penetration 5.0 <br />Haul Route - <br />Task # TTT Page 19 of 143 <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />1100.00 <br />(%) <br />(%) <br />(fpm) <br />Time <br />LCY/Hour Adjusted for job efficiency: <br />410.18 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />1100.00 <br />-6.00 <br />5.00 <br />-1.00 <br />2938 <br />0.444 <br />Haul Time: 0.444 minutes <br />Return Route! <br />C[RCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res Velocity <br />(%) (fpm) <br />Travel <br />Time <br />mm <br />Total Truck Cycle Time: 3.431 <br />minutes <br />1 <br />1100.00 <br />6.00 5.00 <br />11.00 1584 <br />0.702 <br />494.19 <br />LCY/Hour Adjusted for job efficiency: <br />C[RCES Cost Estimating Software <br />Return Time: 0.702 <br />minutes <br />Total Truck Cycle Time: 3.431 <br />minutes <br />Loading Tool unit <br />Production <br />494.19 <br />LCY/Hour Adjusted for job efficiency: <br />410.18 LCY/Hour <br />Truck Unit Production <br />199.49 <br />LCY/Hour Adjusted for job efficiency: <br />165.58 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 331.15 <br />LCY/Hour <br />Adjusted single truck/loader team production: 331.15 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 331.15 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 3.19 <br />Hours <br />Unit cost: <br />$0.651 <br />/LCY Total job cost: $688 <br />C[RCES Cost Estimating Software <br />