Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 17 of 143 <br />TRUCK/LOADER TEAM WORK <br />Task description: King I - Haul topsoil/growth medium to highwall <br />Site: King Coal Mine Permit Action: 007 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado <br />Date: 5/4/2017 County: La Plata <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Abbreviation: None <br />Filename: C035-007 <br />Shift basis: 1 per day <br />Equipment Description <br />Truck Loader Team -Truck: <br />-Loader: <br />Generic 10-12 cy, 6x4 <br />OBSOLETE - CAT 938H <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />NA <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />Cost Rrenkdnwn: Truck/Loader Team Sunnort Eauinment Maintenance Eauivment <br />Total work team cost/hour: $215.69 <br />MATERIAL OUANTITIES <br />Initial volume: 1,057 CCY <br />Loose volume: 1,057 LCY <br />Source of estimated volume: 1.96 acres, 6" <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.000 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,850 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />CIRCES Cost Estimating Software <br />Truck Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$18.29 $25.66 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$39.97 $32.31 <br />NA <br />NA <br />NA <br />NA <br />%Utilization -riper: <br />NA 0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA $0.00 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA $0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 $41.20 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$58.26 $99.17 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $215.69 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $215.69 <br />MATERIAL OUANTITIES <br />Initial volume: 1,057 CCY <br />Loose volume: 1,057 LCY <br />Source of estimated volume: 1.96 acres, 6" <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.000 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,850 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />CIRCES Cost Estimating Software <br />