Laserfiche WebLink
YY) Sediment Pond and Diversion Ditches: The sediment pond is not <br />intended as permanent feature of the mine site, but will remain intact <br />until the site has been successfully reclaimed. <br />ZZ) Cattle Guard: The cattle guard will either be removed or cut up for <br />scrap or offered to the surface grazing lease holder of the area. <br />AAA) Portable Offices and Storage Containers: Until the Executive <br />Offices/Parts Warehouse/Bath House Building is completed, several <br />portable offices and storage containers will be utilized. These units are <br />leased from a 3rd party supplier. <br />BBB) Waterline to Connect to Huntington Ranch Waterline: The <br />waterline will be buried a minimum of 4 feet deep to avoid freezing. The <br />waterline will be left in place during the reclamation phases to supply <br />water to the site for plant germination and dust control. Upon final <br />reclamation, the valve feeding the pipe will be closed. There are no plans <br />to remove the buried portions of the pipe for reclamation purposes. The <br />surface of the field, once the original trench has been back-filled, will be <br />re -seeded using the approved seed mix. <br />CCC) Equipment Storage Area: A small area just north of the shop used <br />to store machinery or supplies. <br />DDD) Return Portal Mine Ventilation Fan: The main mine fan will be a <br />8' diameter fan as part of a steel structure consisting of air doors for <br />escape purposes, explosion doors which protect the fan in the event of a <br />mine explosion, and a culvert system which connects the fan to the <br />underground workings. The fan and steel structures will be removed for <br />final reclamation, however the concrete footers and pads will remain, as <br />they will be covered by approximately 20-30 feet of backfill. <br />EEE) Air Jig Coal Separator Facility: This facility will be constructed <br />in an area north of the existing Crusher/Screen Tower, and will consist <br />of generally modular sections (approximately 12,756 ft3 total volume) <br />with additional and re -purposed existing conveyor belts. The <br />construction of this facility will not require additional surface <br />disturbance. <br />FFF Air Jig Clean Coal Conveyor: 24" conveyor which draws cleaned <br />coal from the bottom of the air jig facility and delivers it to the stoker coal <br />conveyor #2 (JJ). <br />GCC Energy, LLC King II Mine <br />Section 2.05.4 <br />Page 6 February 23, 2018 (MR -47) <br />