Laserfiche WebLink
Truck Travel (Haul & Return) Time: <br />maintained 2.0 <br />Haul Route: <br />Page 5 of 5 <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />N <br />N <br />(fpm) <br />Time <br />min <br />1 <br />3940.00 <br />3.00 <br />2.00 <br />5.00 <br />1550 <br />2.812 <br />Haul Time: 2.812 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />N <br />N <br />(fpm) <br />Time <br />min <br />1 <br />3940.00 <br />-3.00 <br />2.00 <br />-1.00 <br />3503 <br />1.160 <br />Return Time: 1.160 minutes <br />Total Truck Cycle Time: 7.452 minutes <br />Loading Tool unit <br />Production 4,603.46 LCY/Hour Adjusted for job efficiency: 3,820.87 LCY/Hour <br />Truck Unit Production <br />1,408.29 LCY/Hour Adjusted for job efficiency: 1,168.88 LCY/Hour <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 3 Truck(s) <br />Adjusted hourly truck team production: 3,506.64 LCY/Hour <br />Adjusted single truck/loader team production: 3,506.64 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,506.64 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.233 /LCY <br />Total job time: 1,568.45 Hours <br />Total job cost: 56,781,847 <br />CIRCES Cost Estimating Software <br />