Laserfiche WebLink
Page 3 of 5 <br />TRUCK/LOADER TEAM WORK <br />Task description: Load, Haul and Regrade Collom Spoil <br />Site: Colowyo Coal Mine Permit Action: MR219 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 7/2/2020 County: Moffat <br />User: ZTT <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />ipti <br />Truck Loader Team -Truck: KOMATSU 830E <br />-Loader: LETOURNEAU L2350 <br />Support Equipment -Load Area: Cat DI I T - 11 U <br />-Dump Area: Cat D 11 T - 11 U <br />Road Maintenance -Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 14,000 Gal. <br />Abbreviation: None <br />Filename: CO 19-001 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team SUDDort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $4,323.91 <br />1► RV4N01N/:IPKIIIE1,10UY191OP <br />Initial volume: 5,500,000 CCY Swell factor: 1.000 <br />Loose volume: 5,500,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pa.. l�weight) Basis: <br />Material weight: 2,650 Pounds/LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />Rated Payload: 492,200 Pounds <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />100 <br />100 <br />50 <br />35 <br />Ownership cost/hour: <br />$197.30 <br />$437.04 <br />$300.25 <br />$300.25 <br />$55.79 <br />$90.47 <br />Operating cost/hour: <br />$220.67 <br />$438.57 <br />$250.88 <br />$250.88 <br />$30.04 <br />$47.16 <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$34.42 <br />$40.71 <br />$41.30 <br />$41.30 <br />$28.56 <br />$21.12 <br />Unit Subtotals: <br />$452.39 <br />$916.31 <br />$592.43 <br />$592.43 <br />$114.39 <br />$158.75 <br />Number of Units: <br />3 <br />1 <br />1 <br />2 <br />1 <br />1 <br />Group Subtotals: <br />Work: $2,273.48 <br />Support: $1,777.29 <br />Maint: $273.14 <br />Total work team cost/hour: $4,323.91 <br />1► RV4N01N/:IPKIIIE1,10UY191OP <br />Initial volume: 5,500,000 CCY Swell factor: 1.000 <br />Loose volume: 5,500,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pa.. l�weight) Basis: <br />Material weight: 2,650 Pounds/LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />Rated Payload: 492,200 Pounds <br />CIRCES Cost Estimating Software <br />