My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-26_REVISION - M1977321
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977321
>
2020-06-26_REVISION - M1977321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 3:21:40 AM
Creation date
6/29/2020 2:02:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977321
IBM Index Class Name
Revision
Doc Date
6/26/2020
Doc Name
Request for Conversion of Permit
From
Sunnit Brick & Tile Co.
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
disturbed area. The salvaged topsoil/growth medium will then be placed on the seedbed and seeded <br /> using the seed mix provided by the NRCS shown after the Reclamation Timetable. No trees or shrubs <br /> will be planted as we expect natural invasion of those species to occur and no trees or shrubs were <br /> included in the approved revegetation plan. <br /> Roads will be left across the mine to provide access for planting crews, and for the supervision and <br /> inspection of the completed reclamation. These roads will remain when mining ends to ensure the <br /> owner's access to the site. Final grading on the roads will be done before it is closed. <br /> All refuse will be hauled away or disposed of in a manner that will control unsightliness and protect the <br /> drainage system from pollution. There are no acid-forming or toxic materials involved with the <br /> operation. <br /> Final revegetation will be done by the end of the second fall after recoiling is completed. The seeded <br /> area will be monitored for success of revegetation until accepted by the Division for release. If <br /> revegetation failures occur prior to release, an analysis of the site will be made, and the area will be <br /> revegetated again as necessary. <br /> Reclamation Timetable <br /> We estimate that by adding the new area, the life of the mine will be extended between 50 to 70 years. <br /> All reclamation will be completed within 5 years after mining and stockpiled materials have been <br /> removed from the mine. See the mining timetable for more details. <br /> Summit Brick&Tile Company - Native/Pierre Mine 6/24/2020 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.