My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-26_REVISION - M1979192
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979192
>
2020-06-26_REVISION - M1979192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 3:03:55 AM
Creation date
6/29/2020 1:32:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979192
IBM Index Class Name
REVISION
Doc Date
6/26/2020
Doc Name
Request For Amendment To Permit
From
Rockbottom, LLC
To
DRMS
Type & Sequence
AM1
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> 12. Primary future(Post-mining)land use check one): <br /> 1-1 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> 1 1 Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one : <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Bulldoze soils and overburden to stockpile areas prior to gravel extraction with front end loader. <br /> 15. On Site Processing: IZ Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> none <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> No chanae in mining method from past twenty years of operation. Annual production volume is <br /> processed over 2-3 months each year by an outside crushing contractor. A four phase mining <br /> plan is proposed for the 40 added aeres of grave' reserve to be mined ever the next twenty <br /> years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.