Laserfiche WebLink
Phase 2---4.7 acres of mined land plus the 12.3 acres in Phase 1 totaling 17 acres of disturbed land prior <br /> to completion of reclamation activities. Time frame estimation: 2025-2028. <br /> Phase 3---9.4 acres of mining land added to Phase 1 and Phase 2 land. A minimum of 6.5 acres(Osborn <br /> mining tract) will be under final reclamation by initiation of Phase 3 work, resulting in 20 acres under <br /> maximum disturbance. Time frame estimation: 2028-2034. <br /> Phase 4---6.9 acres added to total disturbed land with 10 additional acres in Phase 2 and Phase 3 areas <br /> under final reclamation resulting in 17 acres of maximum disturbed land. Time frame estimation: 2034- <br /> 2042. <br /> (e)Timetable for Mining and Reclamation—Spotted Burro Pit 2020 Amendment Acreages <br /> Time Frame <br /> 2020 2025 2030 2035 2040 2045 <br /> Phase 1-12.3 acres including 6.5 Osborn tract and—6 acres Wild Burro Investment tract <br /> Mining......................Reclamation.......... <br /> Phase 2—4.7 acres plus 6 acres in Phase 1(southern half) <br /> Mining........................Reclamation.......... <br /> Phase 3—9.4 acres in south/central portion of Wild Burro tract <br /> Mining..................Reclamation.......... <br /> Phase 4—6.9 acres in southern end of Wild Burro tract <br /> Mining......................................Reclamation..... <br />