My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-25_REVISION - C1981019 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-06-25_REVISION - C1981019 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 2:43:03 AM
Creation date
6/25/2020 10:51:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
6/25/2020
Doc Name
Proposed Revision Materials
From
Colowyo Coal Company, LP
To
DRMS
Type & Sequence
MR220
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br /> Employees will have a designated area (before and after their shift) to change either into their work <br /> clothes or back into their street clothing. Shower facilities are provided in the complex. Additional <br /> structures in the complex include a diesel fueling and gasoline fueling station for both the large mobile <br /> mine equipment and the mine pickup truck fleet and a tank farm building. Mobile equipment and <br /> employee parking areas are also provided at the complex. A coal stockpile areas shown on Map 22B near <br /> the truck dump and retaining wall provide for temporary storage of the coal. <br /> Anaylsis Laboratory,Emergency Vehicle Garage <br /> Coal analysis will be performed in the- laboratory portion of the structure. The remainder of the structure <br /> is used for storage of the emergency response vehicles. <br /> Crushing and Loadout Facilities <br /> The coal crushing and loadout facilities include two separate facilities: (1) primary crusher; (2) secondary <br /> crusher and train loadout; upon completion of coal production from the South Taylor pit the secondary <br /> crusher at the Gossard loadout may be removed. <br /> The primary crusher facility will be located in Section 36, Township 4 North, Range 94 West, as shown <br /> on Map 22B. Included in the primary crusher facility are a raw coal stockpile area, a truck dump, a <br /> primary crusher, a covered conveyor, a storage bin, and a truck load-out. <br /> Coal will typically be hauled from the pit in rear dump haulage trucks to the primary crusher site. The <br /> coal is then dumped directly into the truck dump hopper, or stockpiled. The truck dump hopper will be <br /> equipped with dust control spray bars. The coal from the stockpile can also be fed into the hopper by <br /> front-end loaders taking from the stockpile. Feeders at the bottom of the truck dump hopper discharge the <br /> coal into the primary crusher. Following primary crushing, the coal is discharged onto a conveyor belt <br /> which transports the coal to a storage bin. The coal is then gravity discharged into highway trucks and <br /> hauled to the secondary crusher facility. <br /> The secondary crusher and train load-out facility is known as the Gossard Loadout and is located in <br /> Section 22, Township 4 North, Range 93 West, and is described in Section 2.05.3 in Volume 1. <br /> Explosives Storage Area <br /> The Collom area explosives storage facilities are scheduled to be constructed near the western perimeter <br /> of the Facilities area(See Map 2213) and will meet or exceed all MSHA and BATFE regulations. Overall <br /> volume of high explosives used by Colowyo collectively while mining activities transition over time from <br /> the existing operation to the Collom area exlusively logically dictates the number, capacity and <br /> configuration of the Collom facility magazines be similar existing facility to ensure sufficient magazine <br /> capacity is available at the time peak utilization of high explosives in the Collom area will occur. This <br /> logical approach is also applied to the ammonium nitrate, emulsion and Type V magazine storage area <br /> also identified on Map 22B. As these structures contain blasting materials and not high explosives, <br /> specific requirements governing their management are different and as such are separated by location <br /> from the high explosives storage area. <br /> Loadout <br /> Colowyo's loadout, the Gossard Loadout, is located at the end of the Colowyo's rail line. The only <br /> segment of the spur within the permit area is shown on Map 22A, Existing Structures North. <br /> Collom—Rule 2,Page 74 Revision Date: 6/22/20 <br /> Revision No.: MR-220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.