My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-25_REVISION - C1981019 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-06-25_REVISION - C1981019 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 2:43:03 AM
Creation date
6/25/2020 10:51:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
6/25/2020
Doc Name
Proposed Revision Materials
From
Colowyo Coal Company, LP
To
DRMS
Type & Sequence
MR220
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br /> A general description of the initiation of mining activities in the Collom Pit is described below: <br /> Sediment Control System Construction: <br /> To begin with, Colowyo will construct some temporary sediment control measures (please see Exhibit 23, <br /> Item 7, Part H), while construction of the downstream sediment control ponds and perimeter ditches <br /> around the temporary spoil pile are being constructed in order to establish sediment control in the area. <br /> (See drawings Exh. 7-23, Figure C4 and Exh. 7-23, Figure C9 for location and layout of the sediment <br /> control ponds.) <br /> Collom Pit and Temporary Spoil Pile: <br /> Topsoil stripping will commence for the initial box cut area and temporary spoil pile once the temporary <br /> sediment control measure area constructed. These areas are depicted on Map 23B. Construction of the <br /> temporary spoil pile underdrain will then commence in the valley bottom progressing upstream from the <br /> southernmost limit of the temporary spoil pile and progressing downstream toward the final toe of the <br /> temporaroy spoil pile. (See profile A-A' on Map 29C). Initial construction of the toe of the temporary <br /> spoil pile (northern extent)will commence concurrently with boxcut development. <br /> For development of the intial box cut of the Collom Pit, Colowyo will utilize truck/shovel techniques. <br /> Mining will be conducted in an up-dip direction. (north to south). Please refer to Table 2.05.6-5 for <br /> specific volumetric information on overburden and coal including swell factor effects. <br /> Please refer to Volume 1, Section 2.05.3 for blasting procedures and sequencing information applicable to <br /> the Collom expansion area activities. Please also refer to Section 4.08 of this package for additional <br /> information. <br /> Once the overburden is sufficiently fragmented to allow for efficient removal and loading, overburden <br /> will be loaded and transported to the temporary out-of-pit spoil stockpile or to adjoining mined-out areas <br /> within the pit. After removal of the overburden, the coal seams will be exposed. As the coal seams are <br /> exposed, they will be cleaned using auxiliary equipment, then either drilled and shot with explosives, or <br /> ripped to prepare the coal for loading and removal. <br /> When explosives are needed, the drilling will be performed by an auger drill. The drill hole pattern is <br /> generally spaced approximately 12 feet by 12 feet,though dependent upon the actual coal seam thickness. <br /> Drill holes will be loaded with either ANFO or a waterproof explosive (if the holes are wet). <br /> Once the coal has been prepared for loading by blasting or ripping, a rubber-tired front-end loader or <br /> excavator will load the coal into haulage trucks. Following loading,these haulage trucks will transport the <br /> coal along in pit haulage routes to the primary crusher located just outside of the pit, as shown on Map <br /> 25D (Collom Haul Roads). Coal from the primary crusher will be loaded into trucks and transported on a <br /> paved haulage road (See Map 25E — Collom Haul Road, Sheets 1-4) to the coal crushing and load-out <br /> facility at the Colowyo permit area as shown on the Structures and Facilities Map (Volume 8, Map 22). <br /> Details of the coal crushing and load-out facilities are included in Volume 1, Section 2.05.3 under the <br /> heading of Mine Facilities. <br /> As the temporary overburden stockpile is constructed, best management practices to reduce sediment <br /> production and excess dust impacts to adjoining areas will be implemented. Interim reclamation and/or <br /> dust suppression chemcials maybe utilized to impacts, if determined to be necessary. <br /> Collom—Rule 2,Page 72 Revision Date: 6/22/20 <br /> Revision No.: MR-220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.