Laserfiche WebLink
TABLE OF CONTENTS <br /> 2.05.3 (6) Overburden.................................................................................................................................77 <br /> 2.05.3 (7) Coal Handling Structures ...........................................................................................................81 <br /> 2.05.3 (8) Coal Mine Waste and Non-Coal Processing Waste ...................................................................81 <br /> 2.05.3 (9) Return of Coal Mine Waste to Abandoned Workings................................................................81 <br /> 2.05.4 (1) Reclamation Plan........................................................................................................................81 <br /> 2.05.4 (2)(a) Reclamation Timetable..........................................................................................................82 <br /> 2.05.4 (2)(b)Reclamation Costs.................................................................................................................82 <br /> 2.05.4 (2)(c) Backfilling Plan.....................................................................................................................82 <br /> 2.05.4 (2)(d)Topsoil Salvage .....................................................................................................................83 <br /> 2.05.4 (2)(e) Reclamation Revegetation.....................................................................................................87 <br /> 2.05.4 (2)(f-h) Disposal, Mine Openings,Water and Air Control..............................................................98 <br /> 2.05.5 Post-Mining Land Uses....................................................................................................................99 <br /> 2.05.6 Mitigation of Impacts of Mining Operations ..................................................................... 102 <br /> 2.05.6 (1)Air Pollution Contol Plan......................................................................................................... 102 <br /> 2.05.6 (2) Fish and Wildlife Plan.............................................................................................................. 102 <br /> 2.05.6 (3)(a) Protection of the Hydrologic Balance.................................................................................. 105 <br /> 2.05.6 (3)(b)(i&ii)Hydrologic Controls.................................................................................................106 <br /> 2.05.6 (4) Protection of Public Parks and Historic Places ........................................................................ 122 <br /> 2.05.6 (5-6) Surface Mining near Underground Mining; Subsidence Control ......................................... 122 <br /> 2.06 PERMIT REQUIREMENTS - SPECIAL MINING CATEGORIES................................ 122 <br /> 2.06.1-3 Scope, Experimental Mining,and Mountain Top Removal....................................................... 122 <br /> 2.06.4 Steep Slope Mining............................................................................................................ 122 <br /> 2.06.5 Variance from Approximate Original Contour Restoration Requirements........................ 122 <br /> 2.06.6 Prime Farmlands................................................................................................................ 122 <br /> 2.06.7 Reclamation Variance........................................................................................................ 122 <br /> 2.06.8 Alluvial Valley Floor(AVF).............................................................................................. 123 <br /> 2.06.9—2.06.11 Augering, Processing Plants, In-Situ Processing..................................................... 127 <br /> 2.06.12.1 Coal Refuse Piles ............................................................................................................... 127 <br /> 2.07—2.10 VARIOUS.......................................................................................................................... 128 <br /> RULE 3 —PERFORMANCE BOND ........................................................................................................... I <br /> RULE 4—PERFORMANCE STANDARDS............................................................................................... 1 <br /> 4.02 SIGNS AND MARKERS..................................................................................................... 1 <br /> 4.02.1 Specifications......................................................................................................................... 1 <br /> 4.02.2 Mine and Permit Identification Signs .................................................................................... 1 <br /> 4.02.3 Perimeter Markers.................................................................................................................. 1 <br /> 4.02.4 Duration of Maintenance........................................................................................................ 1 <br /> 4.02.5 Stream Buffer Zone Markers ................................................................................................. 1 <br /> 4.02.6 Blasting Signs ........................................................................................................................ 1 <br /> 4.02.7 Topsoil Markers..................................................................................................................... 1 <br /> 4.03 ROADWAYS........................................................................................................................ 1 <br /> 4.03.1 Haul Roads............................................................................................................................. 1 <br /> 4.03.2 Access Roads .........................................................................................................................2 <br /> 4.03.3 Light-Use Roads ....................................................................................................................3 <br /> 4.04 SUPPORT FACILITIES.......................................................................................................4 <br /> 4.05 HYDROLOGIC BALANCE ................................................................................................4 <br /> 4.05.1 General Requirements............................................................................................................4 <br /> 4.05.2 Water Quality Standards and Effluent Limitations................................................................4 <br /> 4.05.3 Diversions and Conveyance of a Watershed Less than One Square Mile .............................4 <br /> 4.05.4 Stream Channel Diversions (Relocation of Streams).............................................................4 <br /> 4.05.5 Sediment Control Measures...................................................................................................5 <br /> 4.05.6 Sedimentation Ponds..............................................................................................................5 <br /> ii Revision Date: 6/22/20 <br /> Revision No.: MR-220 <br />