Laserfiche WebLink
RULE 2 PERMITS <br /> Please see Volume 1, Rule 2.06-8 for previously and proposed highwall mining locations in the East and <br /> West Pits. <br /> 2.06.10-2.06.11 Processing Plants,In-Situ Processing <br /> See original permit for these three sections <br /> 2.06.12.1 Coal Refuse Piles <br /> Coal refuse piles do not exist on the Colowyo property. Thus,this section is not applicable. <br /> 2.07—2.10 VARIOUS <br /> Information required by these sections is included in Volume 1, in other sections of this application, in the <br /> cover letter or is not applicable to the South Taylor mining area. Colowyo understands the permitting <br /> process employed by the Division and will facilitate that process as requested. <br /> South Taylor/Lower Wilson—Rule 2,Page 90 Revision Date: 6/22/20 <br /> Revision No.: MR-220 <br />