My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-25_REVISION - C1981019 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-06-25_REVISION - C1981019 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 2:43:03 AM
Creation date
6/25/2020 10:51:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
6/25/2020
Doc Name
Proposed Revision Materials
From
Colowyo Coal Company, LP
To
DRMS
Type & Sequence
MR220
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 2.05.3 (5) Topsoil........................................................................................................................71 <br /> 2.05.3 (6) Overburden.................................................................................................................72 <br /> 2.05.4 (1) Reclamation Plan........................................................................................................74 <br /> 2.05.4 (2)(a) Reclamation Timetable...............................................................................................74 <br /> 2.05.4 (2)(b) Reclamation Costs......................................................................................................75 <br /> 2.05.4 (2)(c) Backfilling Plan..........................................................................................................75 <br /> 2.05.4 (2)(d) Topsoil Salvage and Replacement .............................................................................75 <br /> 2.05.4 (2) (e) Reclamation Revegetation..........................................................................................76 <br /> 2.05.4(f-h) Disposal, Mine Openings,Water and Air Control.....................................................76 <br /> 2.05.5 Post-Mining Land Uses..............................................................................................76 <br /> 2.05.6 Mitigation of Impacts of Mining Operations..............................................................76 <br /> 2.05.E (1) Air Pollution Control Plan..........................................................................................76 <br /> 2.05.6 (2) Fish and Wildlife Plan................................................................................................76 <br /> 2.05.6 (3)(a) Protection of the Hydrologic Balance ........................................................................76 <br /> 2.05.6 (3)(b)(i&ii) Hydrologic Controls...................................................................................................77 <br /> 2.05.6 (3)(b)(111) Probable Hydrologic Consequences...........................................................................77 <br /> 2.05.E (4) Protection of Public Parks and Historic Places ..........................................................84 <br /> 2.05.6 (5-6) Surface Mining near Underground Mining; Subsidence Control...............................84 <br /> 2.06 PERMIT REQUIREMENTS - SPECIAL MINING CATEGORIES............................85 <br /> 2.06.1-3 Scope, Experimental Mining, and Mountain Top Removal.......................................85 <br /> 2.06.4 Steep Slope Mining....................................................................................................85 <br /> 2.06.5 Variance from Approximate Original Contour Restoration Requirements................85 <br /> 2.06.5 (2) (a)Post-Mining Land Use..........................................................................................................85 <br /> 2.06.5 (2) (b) Consultation with Planning Agencies...................................................................................85 <br /> 2.06.5 (2) (c)Alternative Postmining Land Uses .......................................................................................85 <br /> 2.06.5 (2) (d)Watershed Improvements.....................................................................................................85 <br /> 2.06.5 (2) (e) Owner Approval....................................................................................................................86 <br /> 2.06.5 (2) (f) Compliance with Limited Variances.....................................................................................86 <br /> 2.06.6 Prime Farmlands ........................................................................................................86 <br /> 2.06.7 Reclamation Variance ................................................................................................86 <br /> 2.06.8 Alluvial Valley Floor(AVF)......................................................................................86 <br /> 2.06.9 Angering and Highwall Mining .................................................................................89 <br /> 2.06.10-2.06.11 Processing Plants, In-Situ Processing...............................................................................90 <br /> 2.06.12.1 Coal Refuse Piles .......................................................................................................90 <br /> 2.07—2.10 VARIOUS .....................................................................................................................90 <br /> RULE 3 —PERFORMANCE BOND ........................................................................................................... I <br /> RULE 4—PERFORMANCE STANDARDS............................................................................................... 1 <br /> 4.02 SIGNS AND MARKERS................................................................................................ 1 <br /> 4.02.1 Specifications ............................................................................................................... 1 <br /> 4.02.2 Mine and Permit Identification Signs........................................................................... 1 <br /> 4.02.3 Perimeter Markers........................................................................................................ 1 <br /> 4.02.4 Duration of Maintenance.............................................................................................. 1 <br /> 4.02.5 Stream Buffer Zone Markers........................................................................................ 1 <br /> 4.02.6 Blasting Signs............................................................................................................... 1 <br /> 4.02.7 Topsoil Markers ........................................................................................................... 1 <br /> 4.03 ROADWAYS.................................................................................................................. 1 <br /> 4.03.1 Haul Roads...................................................................................................................2 <br /> 4.03.2 Access Roads................................................................................................................2 <br /> 4.03.3 Light-Use Roads...........................................................................................................2 <br /> 4.04 SUPPORT FACILITIES .................................................................................................2 <br /> 4.05 HYDROLOGIC BALANCE...........................................................................................3 <br /> South Taylor/Lower Wilson-ii Revision Date: 6/22/20 <br /> Revision No.: MR-220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.