Laserfiche WebLink
Environmental Assessment <br /> the applicant's proposal, a lease modification would ensure that federal coal resources that cannot be <br /> mined by any other operation are not bypassed and that maximum economic recovery is achieved. <br /> The OSMRE will (1)provide a recommendation to the ASLM to approve, approve with conditions, or <br /> disapprove the COC-62920 mining plan modification; (2) approve or disapprove the GCC SMCRA <br /> permit application to allow coal mining activities and reclamation activities in the proposed lease <br /> modification area; (3) approve or disapprove the permit application to renew the existing SMCRA permit <br /> (CO-0106A)for the King II Mine,which was administratively delayed on Apri14, 2017. <br /> 1.6 Decisions to be Made <br /> Based on the information in this EA,the BLM will decide whether to modify lease COC-62920 as <br /> described in the lease modification application submitted by GCC. In compliance with the MLA,the <br /> decision to be made is in what manner resource development should occur. The BLM Field or District <br /> Manager recommends the lease modification decision,and the Deputy State Director or higher signs the <br /> Decision Record. The recommendation may be to: <br /> ■ Issue a Decision Record for the lease modification based on the analysis conducted within this <br /> EA; <br /> ■ Issue a Decision Record for the lease modification,with additional mitigation measures; <br /> ■ Analyze the potential effects of the proposed project in an EIS; or <br /> ■ Deny the lease modification. <br /> Based on the information in this EA,the OSMRE must: <br /> ■ Decide whether or not to approve a Permit Revision Application Package consisting of a water <br /> monitoring program, Probable Hydrologic Consequences analysis,Right of Entry information, <br /> Subsidence Control Plan, and a Reclamation Plan. <br /> ■ Decide whether or not to approve an application to renew Federal Mine Permit CO-106A. The <br /> permit would reauthorize operations associated with the mining of federal coal from the areas <br /> within Federal Coal Lease COC-62920 where the surface of the land is under the ownership of <br /> the UMU Tribe,but outside of the UMU Indian Reservation. The OSMRE has administratively <br /> delayed its decision on the permit renewal application. <br /> ■ Make a recommendation to the ASLM regarding a decision on proposed mining plan <br /> modifications. The ASLM must decide whether to: (1)approve; (2) approve with conditions; or <br /> (3) deny a mining plan modification to incorporate the lease expansion into SMCRA Permit C- <br /> 1981-035. <br /> 1.7 Conformance with Applicable Land Use Plan(s) <br /> Pursuant to 40 CFR 1502.21, 1508.28, and 1502.20,this site-specific EA tiers to and incorporates by <br /> reference the information and analysis contained in the BLM Colorado Southwest District TRFO <br /> Resource Management Plan (RMP) and Record of Decision(USDOUBLM 2015a). Overall, coal leasing <br /> is in conformance with this RMP. As stated in the RMP, "all TRFO lands made available for lease are <br /> DOI-BLM-CO-S010-2011-0074-EA <br /> September 2017 <br /> -20- <br />