Laserfiche WebLink
ENVIRONMENTAL ASSESSMENT <br /> PH-5.To increase road safety, GCCE would ensure that no trucks haul coal from the King II Mine anytime <br /> the permittee or the LPC Public Works Director, or his/her designee, determines that road conditions <br /> are, or would be in the near future, substandard for any reason such that continued coal hauling could <br /> create an unsafe condition for the traveling public.The permittee would resume allowing trucks to <br /> continue hauling coal from the King II Mine only after the LPC Public Works Director, or his/her <br /> designee,verifies orally or in writing that it is safe to resume hauling <br /> operations. <br /> PH-6. GCCE shall pay an annual Maintenance Fee for their usage of CR 120. Until January 1, 2018,the <br /> Maintenance Fee shall be$0.12 per ton of coal removed from the Mine Project.Thereafter,the <br /> Maintenance Fee shall increase yearly in accordance with increases in the Annual Construction Cost Index <br /> published by the Colorado Department of Transportation. <br />