Laserfiche WebLink
ENVIRONMENTAL ASSESSMENT <br /> PRIOPOSED IN INES LI OF EXCAVATION - <br /> CONSTRUCT EARTHEN <br /> BERM TO DIRECT <br /> RUNOFF TO INLET <br /> � I <br /> � I <br /> LTI-P EAR <br /> SIP 9 RISE <br /> - OPO 0 C CLI S <br /> STORM PIPE WITH 5-YR <br /> STORM CAPACITY ��1 L- <br /> CORRUGATED, <br /> SMOOTH WALLED <br /> POLYPROPYLENE(PP) <br /> WITH REINFORCED <br /> JOINT <br /> OUTLET PROTECTION <br /> EROSION CONTROL ❑ r <br /> _ (RIPRAP) I L <br /> Diagram 2-1. Map View of the Proposed Subsurface Low-Cover Crossing <br /> Dunn Ranch Area Coal Lease by Application COC-78825 and Mine Plan Modification EA 2-3 <br />