My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-24_HYDROLOGY - M1977285 (3)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977285
>
2020-06-24_HYDROLOGY - M1977285 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 2:22:27 AM
Creation date
6/24/2020 3:10:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Hydrology
Doc Date
6/24/2020
Doc Name Note
Appendix G pp 579-771
Doc Name
Hydrology Report
From
Pinon Ridge Mining LLC/Western Water & Land, Inc.
To
DRMS
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Method/Analysis Information <br /> Product: Alkalinity <br /> Analytical Batch: 1373531 Method: SM 2320B Total Alkalinity,Bicarbonate and Carbonate <br /> Sample Analysis <br /> The following samples were analyzed using the analytical protocol as established in SM 2320B: <br /> Sample ID Client ID <br /> 344616001 Sunday MW 1 <br /> 344616002 Sunday MW 1D <br /> 344616003 Sunday MW 2 <br /> 344616004 Sunday MW 3 <br /> 1203053474 Method Blank(MB) <br /> 1203053475 Laboratory Control Sample(LCS) <br /> The samples in this SDG were analyzed on an"as received"basis. <br /> SOP Reference <br /> Procedure for preparation,analysis and reporting of analytical data are controlled by GEL Laboratories LLC as <br /> Standard Operating Procedure(SOP).The data discussed in this narrative has been analyzed in accordance with <br /> GL-GC-E-033 REV# 11. <br /> Preparation/Analytical Method Verification <br /> The SOP stated above has been prepared based on technical research and testing conducted by GEL Laboratories, <br /> LLC.and with guidance from the regulatory documents listed in this"Method/Analysis Information" section. <br /> Calibration Information <br /> The Titration analysis was performed on a manually operated buret. <br /> Initial Standardization <br /> The titrant was properly standardized <br /> Quality Control(OC)Information <br /> Method Blank(MB)Statement <br /> The MB analyzed with this SDG met the acceptance criteria. <br /> Laboratory Control Sample(LCS)Recovery <br /> The LCS spike recovery met the acceptance limits. <br /> Page 53 of 94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.