My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-23_REVISION - M2018037 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2018037
>
2020-06-23_REVISION - M2018037 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 2:12:13 AM
Creation date
6/24/2020 9:33:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018037
IBM Index Class Name
REVISION
Doc Date
6/23/2020
Doc Name
Request For Amendment To Permit
From
BURNCO COLORADO LLC
To
DRMS
Email Name
MAC
ECS
JXT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 2: This phase will consist of the WWTP cell and will take about 4 years to mine <br /> and 2 years to reclaim. <br /> Phase 3: This phase will consist of the eastern cell and will take approximately 3 years <br /> to mine and 2 years to reclaim. <br /> Phase 4: This phase will consist of the western cell and its subcells 4a and 4b and will <br /> take approximately 7 years to mine and 2 years to reclaim. <br /> (� A description of <br /> i. Final grading-maximum anticipated slope gradient or expected ranges thereof,• <br /> The finished slopes of the reservoirs will be 3 horizontal to 1 vertical. <br /> ii. Seeding-types, mixtures, quantities and time of application, <br /> Please refer to the Reclamation Plan Map for the list of plant materials and seeds to be <br /> utilized. The operator will seed during the appropriate season to ensure adequate <br /> moisture for germination and implement weed controls to allow the grasses to successfully <br /> establish. Additional plantings may be installed once the reservoirs are full of water and <br /> the grasses are established. <br /> in. Fertilization-types, mixtures, quantities, and time of application, <br /> The type and application rate of fertilizer shall be determined based on a soil test at the <br /> time of final reclamation. <br /> iv. Re vegetation-types of trees, shrubs, etc.;and <br /> Please refer to the Reclamation and Landscape Plan Maps for the types, quantities and <br /> location of trees and shrubs to be planted. <br /> v. Topsoiling-specify anticipated minimum depth or range of depths for those areas <br /> where topsoil will be replaced. <br /> Topsoil will be uniformly placed and spread on all areas disturbed by the mining above the <br /> anticipated high water line. The minimum thickness shall be 6 inches above the <br /> surrounding finished grade. <br /> WEED MANAGEMENT PLAN <br /> Burnco Colorado, LLC has a full-time weed manager on staff. This person is responsible for <br /> monitoring and controlling noxious weeds as they appear. Burnco Colorado, LLC typically prefers <br /> to control weeds mechanically, by mowing and/or discing. If necessary, weeds will be killed with a <br /> contact herbicide. Bestway Concrete has all of the necessary equipment in house to perform these <br /> tasks. <br /> Inouye Gravel Mine-City of Fort Lupton,WWTP-MLRB 112 Permit Amendment <br /> Exhibit E-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.