Laserfiche WebLink
OTHER PERMITS AND LICENSES REQUIRED EXHIBIT F <br /> 1 . An Air Pollution permit will be applied for if needed. <br /> 2 . No County permit is needed in Grand County to complete the <br /> project . Attached is a copy of correspondence from the Grand <br /> County Planning Department dated 2/24/2020 to that effect . <br /> 3 . This is an open pit operation and ground water will not be ex- <br /> posed so a well permit and temporary supply plan is unneces- <br /> sary. <br /> 4 . A dredge fill permit (404) is not required because there are <br /> no waters of the U. S . on this site that will be impacted. <br /> S . A Storm Water Management Plan (SWMP) will be prepared for this <br /> pit if there is a potential for surface water leaving the <br /> site . <br /> 6 . A CPDS permit to cover stormwater runoff and dewatering is <br /> not required, all stormwater will be retained on-site and <br /> allowed to soak into the gravely substrata . <br /> Track 4 Grading Project June 11, 2020 <br /> 30 <br />