My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-23_PERMIT FILE - M2020030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020030
>
2020-06-23_PERMIT FILE - M2020030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:14:01 PM
Creation date
6/23/2020 11:32:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020030
IBM Index Class Name
PERMIT FILE
Doc Date
6/23/2020
Doc Name
Completeness Response
From
Salisbury Gladstone LLC
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
295796 06/17/2020 10:27 AM 8: 984 P: 630 PERMIT <br /> Page 26 of 44 R $2284.00 D $0.00 T $228.00 Clear Creek <br /> f. II Zone 6,Alpine 1III atilt <br /> Site Description: The elevation of the Alpine zone range is 11,400 feet and above. The general <br /> area includes all areas above timberline. Annual precipitation ranges from 20 to 25 inches per <br /> year.Average annual high temperature is 52°F and an average annual low temperature of 18°F. <br /> Seed Mix Species Scientific Name Application Rate <br /> PLS(pounds of pure <br /> live seed per acre for <br /> Drill seeding. <br /> Double rate for <br /> broadcast seeding <br /> Grasses Tufted hairgrass Deschampsia 0.4 <br /> ces itosa <br /> Alpine bluegrass Poa alpine 0.4 <br /> S ike trisetum Trisetum s icatum 0.17 <br /> Alpine Phleum alum 0.35 <br /> 6) How will the selected seed mixture be seeded(check one): <br /> Drilled Broadcast <br /> Hydroseeded IR Aerial seeded <br /> Other: <br /> Note:Application rates need to be doubled for hydroseeding,aerial and broadcast seeding. <br /> 7) Will trees be planted as a part of the reclamation plan(check one): (l r 1 1 Yes dD)No <br /> a. If yes,please list the species: Native <br /> 8) Will Shrubs be planted as a part of the reclamation plan(check one): (n,)Yes( ✓�jNo <br /> a. If yes,please list the species: <br /> 9) Will mulch be used(check one): (J:2)Yes(IZ,)No <br /> a. If yes, what kind will be used: <br /> Crimping method: <br /> Application Rate: <br /> 10)Will Fertilizer be used(check one): d--2)Yes c—Zb No <br /> a. If yes, what kind will be used: <br /> Application method: <br /> Application Rate: <br />
The URL can be used to link to this page
Your browser does not support the video tag.