My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-23_PERMIT FILE - M2020030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020030
>
2020-06-23_PERMIT FILE - M2020030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:14:01 PM
Creation date
6/23/2020 11:32:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020030
IBM Index Class Name
PERMIT FILE
Doc Date
6/23/2020
Doc Name
Completeness Response
From
Salisbury Gladstone LLC
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D -Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E -Map. <br /> 1) Primary future(Post-mining) land use (check one): <br /> Cropland(CR) _a Pastureland(PL) General Agriculture (GA) <br /> Rangeland(RL) Ja Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) _. Recreation(RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Waste rock will be removed and original grade reestablished <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 100 H: 40 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: IV (example 1 H:1 V, 2H: IV, etc.),please <br /> include a justification: <br /> We will match existing grades <br /> a. Please provide a general description of the backfilling and grading: <br /> Grading will occur after waste rock is removed <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches 6-8 inches <br /> 8-10inches 10-12inches <br /> ++ Other: <br /> r7l_ N/A, explain.Wwillbe reme eFeek esing o ri.Re ding needing�g�ra� exp ms-original � g�;,Ts-a� �,,,� <br /> 295796 06/17/2020 10:27 AM B: 984 P: 626 PERMIT <br /> Page 22 of 44 R $228.00 D $0.00 T $228.00 Clear Creek <br /> III U KU4 URY110AIN 11111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.