Laserfiche WebLink
295796 06/17/2020 10:27 AM B: 984 P: 619 PERMIT <br /> Page 15 of 44 R $228.00 0 $0.00 T $228.00 Clear Creek <br /> 16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br /> cost the State of Colorado using an independent contractor to complete reclamation. The <br /> Office adds up to an additional maximum eighteen and one half(18.5%)percent of that <br /> total,which includes a private contract,typical overhead costs and profit. <br /> Direct Cost: <br /> i. Backfilling: (cubic yards)X$ (cost per yard)=Total$ <br /> ii. Grading: 100 (cubic yards)X$ 10 (cost per yard)=Total$ 1000 <br /> iii. Topsoil: 100 (cubic yards)X$20 (cost per yard)=Total$ 2000 <br /> iv. Seeding: 2 (acres)X$500 (cost per acre)=Total$ 1000 <br /> v. Mobilization: 2 (Pieces of equipment)X$500 (cost per equipment)_ <br /> Total$ 1000 <br /> Direct Cost Subtotal: $ 5000 <br /> Division's total overhead cost: X 18.5% <br /> Division's Total cost: $ 5925.00 <br /> Note: Based on the Division's experience the required financial warranty is normally set at <br /> approximately$2,500 per acre. Therefore,a typical 5 acre permit will have a total required financial <br /> warranty in the amount of$12,500. <br />