My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-23_PERMIT FILE - M2020030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020030
>
2020-06-23_PERMIT FILE - M2020030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:14:01 PM
Creation date
6/23/2020 11:32:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020030
IBM Index Class Name
PERMIT FILE
Doc Date
6/23/2020
Doc Name
Completeness Response
From
Salisbury Gladstone LLC
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C-Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: 7/1/2020 and completion: 7/1/2030 _2 <br /> LO <br /> in <br /> 2) How many years is the mine anticipated to be operational: 10 years o m <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits(check one): 40-m <br /> (�all-yearlong or(� seasonally,explain: _too <br /> N <br /> 1 N� <br /> COG <br /> 4) How many aces of the mine site will be disturbed at any given time: 4 acres mN <br /> O3 <br /> 5) De th of topsoil to be salvaged (only for surface disturbances) (check one): mm <br /> 4-6 inches 6-8 inches <br /> 8-10 inches �10-12 inches mA <br /> Other: <br /> -�b►v <br /> N•• <br /> N/A, explain: Working on top of an existing waste rock dump <br /> 6 Will you need to move an overburden check one • Yes or No m� <br /> Y Y ( )• (�) (�) v <br /> a. If yes,approximately how thick is the overburden? feet 3 <br /> 7) How will the mine be accessed: CO) existing roads Ca new roads will be created _ <br /> m <br /> Please describe the existing roads: <br /> Existingro ad provides access to the Mill lncatiun <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> Grading of Pxicting road <br /> 8) Will water be needed during the mining operation (check one): (]a)Yes or(12)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> Clear Creek,A original copy of the 1881 mineral Patent attached.We will have a 2000 gallon holding <br /> tank that will recycle water.Water use will be 40GPM <br /> 9) Will any water diversions or impoundments be constructed(check one): (_a)Yes or(Ja)No <br /> a. If yes,please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process(check one): (-a)Yes or(_2L)No <br /> a. If yes,please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br /> None <br />
The URL can be used to link to this page
Your browser does not support the video tag.