Laserfiche WebLink
' Rock_Chute.xls Page 3 of 3 <br /> Rock Chute Design Calculations <br /> ' (Version WI-July-2010, Based on Design of Rock Chutes by Robinson, Rice, Kadavy, ASAE, 1998) <br /> Project: Morrison Quarry- Basin B Outlet County: Jefferson <br /> Designer: TPY Checked by: <br /> ' Date: 5/18/2020 Date: <br /> V. Calculate the rock chute parameters (w/o a factor of safety applied) <br /> ' High Flow Low Flow <br /> qt= 0.11 cros/m qt= 0.05 cros/m (Equivalent unit discharge) <br /> D50(mm)= 110.26 > (4.34 in.) D50= 75.33 mm (Median angular rock size) <br /> ' n= 0.050 n = 0.047 (Manning's roughness coefficient) <br /> z1 = 0.20 ft, z1 = 0.13 ft. (Normal depth in the chute) <br /> A,= 0.1 ft2 A, = 0.0 ft2 (Area associated with normal depth) <br /> Velocity= 7.36 fps Velocity= 5.60 fps (Velocity in chute slope) <br /> Zmean= 0.10 ft. zmean= 0.06 ft. (Mean depth) <br /> F, = 4.08 F, = 3.92 (Froude number) <br /> ' Lrock apron= 5.43 ft. ---- ---- (Length of rock outlet apron= 15*D50) <br /> VI. Calculate the height of hydraulic iump height(coniugate depth) <br /> ' High Flow Low Flow <br /> Z2= 0.57 ft. z2= 0.35 ft. (Hydraulic jump height) <br /> Ohigh= 0.6 cfs Ohigh= 0.2 cfs (Capacity in channel) <br /> ' A2= 0.7 ft2 A2= 0.2 ft2 (Flow area in channel) <br /> VII. Calculate the energy lost through the iump(absorbed by the rock) <br /> High Flow Low Flow <br /> E, = 1.04 ft. E1 = 0.61 ft. (Total energy before the jump) <br /> E2= 0.59 ft. E2= 0.36 ft. (Total energy after the jump) <br /> RE= 43.79 % RE= 41.65 % (Relative loss of energy) <br /> Calculate Quantities for Rock Chute <br /> -------Rock Riprap Volume------- -------Bedding Volume------- <br /> Area Calculations Length(a)Rock CL Area Calculations <br /> h= 0.69 Inlet= 9.84 h = 2.69 Bedding Thickness <br /> ' x, = 4.47 Outlet= 10.35 x, = 0.00 t1,t2 = 0.00 in. <br /> L= 1.54 Slope= 79.78 L= 6.02 <br /> As= 3.09 2.5:1 Lip= 5.18 As= 0.00 Length ZV Bed CL <br /> ' x2= 4.00 Total = 105.15 ft. x2= 0.00 Total = 105.13 ft. <br /> Ab= 9.89 Rock Volume Ab= 0.00 Bedding Volume <br /> Ab+2*A5= 16.06 ft2 62.54 yd3 Ab+2*A5= 0.00 ft2 0.00 yd3 <br /> ' -------Geotextile Quantity------- Note: 1)The radius is not considered when calculating <br /> Width Length(a?Bot. Rock quantities of riprap, bedding,or geotextile. <br /> 2*Slope= 12.03 Total = 105.13 ft. 2)The geotextile quantity does not include over- <br /> Bottom = 0.94 Geotextile Area overlapping(18-in. min.)or anchoring material <br /> Total= 12.97 ft, 151.56 yd2 (18-in. min. along sides, 24-in. min.on ends). <br />